Surrounding North and SOuth Carolina

New Construction Inspections

Ensure Your New Home Is Truly Move-In Ready with a Final Inspection You Can Trust

WHY A THOROUGH FINAL INSPECTION MATTERS

Why Choose a Final Home Inspection Before Closing?

  • Ensures Quality Completion:
    ClearVUE Home Inspections performs a comprehensive final walkthrough to confirm that your new home meets construction standards and your expectations. We check finish quality, window and door alignment, appliance installation, and visual defects—ensuring everything is complete, clean, and ready for move-in.

  • Protects Your Long-Term Investment:
    Our inspection covers system functionality (HVAC, plumbing, electrical), code compliance, and craftsmanship issues often missed during construction. Whether it’s a custom home or a standard build, we help you avoid last-minute surprises and give you peace of mind before you sign off.

CONFIDENCE BEFORE YOU CLOSE

Final Home Inspection for a Smooth, Stress-Free Move-In

  • Catch Issues Before You Get the Keys
    ClearVUE doesn’t just walk through your home—we conduct a detailed final inspection to identify overlooked finish flaws, code violations, or incomplete installations. We assess system readiness, appliance setup, and window/door function to ensure everything meets your expectations before closing.

  • Customized Peace-of-Mind Inspections
    Whether you're in Fort Mill, Rock Hill, or nearby areas, we tailor each final inspection to the unique characteristics of your property. Our service helps you make informed decisions and ensures a smooth transition into your new home—without delays or frustrations.

FINAL INSPECTION. COMPLETE CONFIDENCE.

ClearVUE’s Proven Four-Step Final Home Inspection Process

Full Property Walkthrough

Ensuring Everything is Move-In Ready

Our licensed inspectors walk your new home inside and out—evaluating finishes, flooring, doors, windows, trim, and other visible elements for defects or incomplete work. We make sure every corner is move-in ready before closing.

System Performance Checks

Testing HVAC, Plumbing, and Electrical Functionality

We test essential systems for proper operation, including heating and cooling, visible plumbing, and electrical systems. Our inspection catches malfunctions or code issues before they become your responsibility.

on-target

Finish & Fixture Evaluation

Detail-Oriented Checks for Cosmetic and Structural Issues

From loose handles to uneven doors or drywall blemishes, we inspect all the final touches. Our goal is to help ensure your home is completed to the standards you deserve.

Final Report & Builder Review

Documented Results for Buyer and Builder Clarity

You receive a comprehensive report detailing all findings. This helps you communicate clearly with your builder to address items before your final walkthrough or closing day.

I was shocked at the level of detail in this company's report. Simply amazing. They went above and beyond what was necessary as if they were inspecting a home for themselves. I cannot recommend them enough. Do not hesitate to use ClearVUE, you will not be disappointed.

— William Bowling

Construction Inspections FAQs

1. What is a final home inspection?

A final home inspection is the last detailed evaluation of a newly built home before closing. It ensures all systems, finishes, and components are installed correctly, functioning properly, and meet industry standards.

2. Why is a final inspection necessary if my builder already did a walkthrough?

Builder walkthroughs often focus on cosmetic items, while a final inspection by ClearVUE includes deeper checks—like system performance (HVAC, plumbing, electrical), code compliance, and potential safety issues your builder might miss.

3. What does ClearVUE inspect during a final inspection?

We evaluate system performance (HVAC, electrical, plumbing), finish quality, window and door operation, appliance installation, visible safety/code issues, and overall workmanship.

4. When should I schedule a final inspection?

It should be scheduled shortly before your final walkthrough with the builder—ideally once all construction and installations are complete, but before closing on the home.

5. How long does a final inspection take?

Most final home inspections take between 2 to 3 hours, depending on the size and complexity of the property.

6. Do I need to be present for the final inspection?

You’re not required to be there, but we recommend it. Being present allows you to see any issues firsthand and ask questions directly as they come up.

7. Will I get a report after the inspection?

Yes. You’ll receive a detailed digital report with photos and explanations of all findings, which you can use during your final builder meeting or request for repairs.

8. What if issues are found during the final inspection?

Your report helps you communicate clearly with your builder before closing. Most builders will address identified problems under your warranty or before final delivery.

9. Is this the same as a pre-drywall inspection?

No. A pre-drywall inspection is done during construction before walls are sealed up. The final inspection occurs at the end of the build process to confirm everything is complete and functional.

10. Is Fort Mill within ClearVUE’s service area for final inspections?

Yes! Fort Mill is proudly within our service coverage area. Reach out anytime to schedule your final inspection.

CLEAR INSIGHTS, CONFIDENT DECISIONS

You relax, we uncover what matters most

Address

12824 Cathy Ct, Midland, NC 28107, United States

Contact Us

Follow Us

© 2025 ClearVUE Home Inspection. All rights reserved.

Image

For a Faster Quote